Home Health Billing Under PDGM: 30-Day Periods, the NOA, and the Final Claim

15 min read Medical Billing 2026 Guide
A flat illustration of a home health nurse visiting a patient at home with a calendar and a claim form, no text in the image

Direct answer: Under Medicare, home health is paid in 30-day periods under the Patient-Driven Groupings Model, known as PDGM, and the billing clock starts before the money does. For every admission, the agency submits a one-time Notice of Admission, called the NOA, on type of bill 032A, and it must be submitted and accepted by the Medicare Administrative Contractor within five calendar days after the start-of-care date. If the NOA is late, Medicare reduces the payment for the period by one-thirtieth for each day from the start-of-care date to the date the NOA is submitted and accepted, and the reduction is counted from the start of care, not from the end of the five-day window. Each 30-day period is then paid on its own final claim, type of bill 0329, after the period ends, with a five-character HIPPS code on revenue code line 0023 that identifies the case-mix group. Periods with too few visits fall under the Low Utilization Payment Adjustment, called LUPA, and are paid per visit instead of the full period amount. The NOA carries no payment, and there is no Request for Anticipated Payment any more, because the RAP was eliminated on 1 January 2022.

THE NOA CLOCK COMES FIRST

The NOA is a one-time electronic notification that tells Medicare a home health admission has begun. It replaced the Request for Anticipated Payment on 1 January 2022, and unlike the RAP, the NOA is submitted once per admission, not once per 30-day period, and it carries no advance payment. The NOA must be submitted to, and accepted by, the agency's Medicare Administrative Contractor within five calendar days after the start-of-care date, which is the date of the first billable skilled visit. Before submitting the NOA, the agency must have the certifying practitioner's written or verbal order for the initial visit, documented as required at 42 CFR 484.60(b) and 42 CFR 409.43(d), and the initial visit must have been made with the patient admitted to home health care. The practical habit is to submit the NOA on the day of the start-of-care visit and not to wait for the OASIS assessment, because the OASIS is not a precondition for the NOA.

THE LATE NOA PENALTY, ONE-THIRTIETH PER DAY

If the NOA is not timely filed, Medicare reduces the payment for the period of care, including any outlier payment, by the number of days from the home health admission date to the date the NOA is submitted to, and accepted by, the Medicare Administrative Contractor, divided by 30. In plain terms, the agency loses one-thirtieth of the period payment for every day from the start of care until the NOA is accepted, and the count starts at the start of care, not at the end of the five-day window. A late NOA can span more than one 30-day period, and each affected period is subject to the reduction. Two further consequences make the penalty sharper. First, no LUPA per-visit payments are made for visits that occurred on days before the NOA was submitted. Second, the reduction is a provider liability, so the agency cannot bill the beneficiary for the amount withheld, and the reduction amount is shown on the claim with value code QF. The penalty cannot exceed the total payment for the claim, so the agency will not owe money back, but a very late NOA can wipe out the period payment entirely. CMS allows an exception to the late-filing penalty in four narrow circumstances, including fires, floods, earthquakes, or other unusual events that inflict extensive damage on the agency's ability to operate, and an event that produces a data filing problem caused by CMS or the Medicare Administrative Contractor. If an exception is requested, the KX modifier is appended to the HIPPS code reported on the 0023 revenue code line. This penalty rule is set out at 42 CFR 484.205(j)(3) and in CMS Pub. 100-02, Chapter 7, Transmittal 11447.

THE 30-DAY PDGM PERIOD AND THE HIPPS CODE

PDGM has been the Medicare home health payment system since 1 January 2020, when the Bipartisan Budget Act of 2018 changed the unit of payment from a 60-day episode to a 30-day period. A 60-day certification period now contains two 30-day payment periods, and each period is classified and paid on its own. Each 30-day period is placed into one of 432 case-mix groups, and the group is reported on the claim as a five-character HIPPS code on the revenue code 0023 line, with zero charges on that line. The case-mix group is built from five variables, and the table below shows each one.

PDGM variableWhat it does
Admission sourceInstitutional, when the patient was discharged from a hospital or post-acute stay in the prior 14 days, or community
TimingFirst 30-day period of care, or a later period in the same admission
Clinical groupingOne of 12 clinical groups set by the principal diagnosis, such as musculoskeletal rehabilitation, neuro or stroke rehabilitation, wounds, behavioral health, complex nursing interventions, and several medication management, teaching and assessment groups
Functional impairment levelLow, medium, or high, set by functional items in the OASIS assessment
Comorbidity adjustmentNone, low, or high, set by secondary diagnoses on the claim

The principal diagnosis carries the most weight, because it sets the clinical group, and a diagnosis that Medicare treats as vague or unacceptable as a primary diagnosis will send the claim back. The OASIS assessment drives the functional impairment level, so the start-of-care OASIS, and the recertification OASIS each 60 days, must be completed and submitted to the iQIES system before the final claim goes out. The plan of care must be certified by a physician, nurse practitioner, clinical nurse specialist, or physician assistant, and the certifying practitioner must document a face-to-face encounter related to the primary reason for home care, performed within 90 days before or 30 days after the start of care. The period payment is a national standardized 30-day amount, adjusted for case-mix and for geographic differences in wages, and the OASIS, orders, diagnoses, visit notes, and schedule should be reconciled before the final claim is released.

VISIT G-CODES AND REVENUE CODES

Every visit in the period is reported on the final claim with a visit G-code, a revenue code, and units in 15-minute increments. The table below shows the common visit codes for each discipline.

DisciplineRevenue codeCommon HCPCS visit codes
Physical therapy042XG0151, and G0157 for a physical therapy assistant
Occupational therapy043XG0152, and G0158 for an occupational therapy assistant
Speech-language pathology044XG0153
Skilled nursing055XG0299 and G0300 for direct skilled services of a licensed nurse, G0162 for registered nurse management and evaluation of the plan of care
Medical social services056XG0155
Home health aide057XG0156

Visit counts matter beyond the payment amount, because the number of visits in a period decides whether the period qualifies for the full period payment or falls into LUPA, which is covered below. Visit notes should support the G-code and the units reported, and the visit dates must fall inside the 30-day period on the claim.

THE FINAL CLAIM, TYPE OF BILL 0329

The final claim is how the agency actually gets paid under PDGM, because the NOA carries no payment. The original final claim for each 30-day period is submitted on type of bill 0329, after the period ends, usually as an electronic 837 institutional claim, with the CMS-1450 or UB-04 as the paper equivalent when an electronic submission exception applies. Claims are billed sequentially, so the NOA goes first, then one final claim for each 30-day period as it ends. The final claim carries the HIPPS code on the revenue code 0023 line, every visit line with its G-code and 15-minute units, the principal and secondary diagnoses that drive the clinical group and the comorbidity adjustment, the occurrence codes and dates that identify admission source and timing, and the value codes for the core-based statistical area and the county where services were provided. Occurrence code 50 carries the OASIS assessment completion date, so the OASIS must be submitted before the claim. Orders must be signed before the final claim is submitted, and the timely filing limit for Medicare is 12 months, although cash flow argues for days rather than months. If a submitted claim needs correcting, an adjustment claim uses type of bill 0327, and a void or cancel uses type of bill 0328.

LUPA THRESHOLDS, TWO TO SIX VISITS

A period that does not meet the visit threshold for its case-mix group is paid under the Low Utilization Payment Adjustment, known as LUPA, instead of the full period amount. The LUPA threshold ranges from 2 to 6 visits, depending on the group, and a period below its threshold is paid per visit for the discipline providing care, rather than the case-mix adjusted period amount. One missed or rescheduled visit near the threshold can therefore cost far more than the visit itself, because crossing the threshold changes the payment from per-visit to the full period amount. Scheduling and visit tracking should watch the count against the threshold for each open period, and a period that lands one visit short should be reviewed before the claim goes out, because the visits are already delivered and the threshold cannot be fixed after the period ends. Remember also that no LUPA per-visit payments are made for visits that occurred before a late NOA was submitted, so a late NOA can cost a low-utilization period its entire payment.

WORKED EXAMPLE, ALL FIGURES ILLUSTRATIVE

Every figure in this example is illustrative, and no payment rate is quoted. A home health agency admits a patient with a start-of-care date of 1 March, and the first 30-day period runs from 1 March to 30 March. The agency submits the NOA, and it is accepted on 10 March, which is 9 days after the start of care and 4 days past the five-day deadline. The late-filing reduction is 9 divided by 30 of the period payment. If the illustrative wage-adjusted period payment is 2,400 dollars, the reduction is 9 divided by 30 times 2,400 dollars, which is 720 dollars, leaving 1,680 dollars before any other adjustment. The reduction is shown on the claim with value code QF, and the agency cannot bill the patient for the 720 dollars. In a second period for the same patient, the case-mix group carries a LUPA threshold of 4 visits, but only 3 visits are delivered in the period, so the period is paid per visit under LUPA instead of the full period amount. In a third period, 5 visits are delivered, which meets the threshold of 4, so the period is paid the full case-mix adjusted period amount. The three periods show the two clocks that run a home health claim: the NOA clock at intake, and the visit-count clock across the 30 days.

THE RAP IS GONE, DO NOT BILL IT

The Request for Anticipated Payment, known as the RAP, was the old advance payment submitted for each 30-day period, and it was eliminated for periods of care with a from date on or after 1 January 2022. The NOA replaced it, and the NOA is a one-time submission per admission with no upfront payment. Any workflow, checklist, or software template that still lists a RAP step for a current period is out of date, and following it will not produce a payment. Payment for each 30-day period now comes only with the final claim, type of bill 0329, after the period ends.

COMMON MISTAKES THAT COST PERIOD PAYMENTS

The first common mistake is waiting for the OASIS before submitting the NOA, which burns the five-day window and starts the one-thirtieth per day reduction. The second is treating the NOA as a per-period filing, when it is a one-time submission per admission that covers all contiguous 30-day periods until discharge. The third is submitting the final claim before the OASIS is in iQIES or before the orders are signed, which invites a rejection or a return. The fourth is reporting a vague or unacceptable principal diagnosis, which puts the period in the wrong clinical group or sends the claim back. The fifth is letting a period land one visit short of its LUPA threshold, which turns a full period payment into per-visit payment. The sixth is still listing a RAP step in the workflow, which no longer produces any payment. The seventh is billing the patient for a late-NOA reduction, which is a provider liability and cannot be passed to the beneficiary.

CHECKLIST

Confirm the certifying practitioner's order for the initial visit is received and documented before the start-of-care visit. Make the initial visit and admit the patient. Submit the NOA, type of bill 032A, on the day of the start-of-care visit, and confirm it is accepted within five calendar days after the start-of-care date. Do not wait for the OASIS to file the NOA. If the NOA is late, calculate the reduction as the days from the start-of-care date to the NOA acceptance date, divided by 30, show it with value code QF, and do not bill the patient for it. Consider whether one of the four exception circumstances applies, and if an exception is requested, append the KX modifier to the HIPPS code on the 0023 line. Complete the start-of-care OASIS and submit it to iQIES, confirm the face-to-face encounter is documented within 90 days before or 30 days after the start of care, and confirm the plan of care is certified. Track visits against the LUPA threshold for the period, which ranges from 2 to 6 visits depending on the group. After the period ends, reconcile the OASIS, orders, diagnoses, visit notes, and schedule, confirm the orders are signed, then submit the final claim, type of bill 0329, with the HIPPS code on revenue code line 0023, the visit G-codes with 15-minute units, the principal and secondary diagnoses, and occurrence code 50 with the OASIS completion date. Do not submit a RAP, because the RAP was eliminated on 1 January 2022. Bill each 30-day period on its own final claim, in sequence after the NOA.

FREQUENTLY ASKED QUESTIONS

What is the Notice of Admission in home health billing? The NOA is a one-time electronic notification that tells Medicare a home health admission has begun. It is submitted on type of bill 032A, it replaced the Request for Anticipated Payment on 1 January 2022, and it carries no payment. How quickly must the NOA be filed? The NOA must be submitted to, and accepted by, the Medicare Administrative Contractor within five calendar days after the start-of-care date. What happens if the NOA is late? Medicare reduces the payment for the period by one-thirtieth for each day from the start-of-care date to the date the NOA is submitted and accepted. The reduction counts from the start of care, not from the end of the five-day window, and it is a provider liability, so the patient cannot be billed for it. What is PDGM? The Patient-Driven Groupings Model is the Medicare home health payment system in effect since 1 January 2020. It pays a case-mix adjusted amount for each 30-day period of care, placing every period into one of 432 case-mix groups based on admission source and timing, clinical group, functional impairment, and comorbidity adjustment. What is a HIPPS code? A HIPPS code is a five-character code that identifies the case-mix group for a 30-day period. It is reported on the final claim with revenue code 0023. What is the type of bill for the final claim? The original final claim for a 30-day period uses type of bill 0329, and it is submitted after the period ends. What is LUPA? The Low Utilization Payment Adjustment applies when a period has fewer visits than its case-mix group's threshold, which ranges from 2 to 6 visits. A LUPA period is paid per visit instead of the full period amount. When is the OASIS due? The start-of-care OASIS must be completed and submitted to iQIES before the final claim is submitted, and occurrence code 50 on the claim carries the OASIS completion date. The OASIS is not a precondition for the NOA, so do not wait for it before filing the NOA. Is the RAP still used? No. The RAP was eliminated for periods of care with a from date on or after 1 January 2022, and the NOA replaced it. There is no advance payment under the NOA. Can the agency bill the patient for a late-NOA reduction? No. The reduction is a provider liability, and the agency cannot bill the beneficiary for it. What if the NOA is late because of a disaster or a CMS filing problem? CMS allows an exception in four narrow circumstances, including fires, floods, earthquakes, or other unusual events that damage the agency's ability to operate, and a data filing problem caused by CMS or the Medicare Administrative Contractor. If an exception is requested, append the KX modifier to the HIPPS code on the 0023 line.

A note on codes and coverage: This article is educational information about medical billing rules, not legal, financial or compliance advice. Codes, coverage rules and payer policies vary and change over time, so always verify the current rule against the CMS manuals, specifically CMS Pub. 100-02, Chapter 7, and CMS Pub. 100-04, Chapter 10, and the specific Medicare Administrative Contractor guidance before acting. The worked example uses illustrative figures only, and no payment rates are given because rates vary by case-mix group, wage index, and locality.

Having trouble with home health billing, or with NOA penalties and LUPA denials? Neximed Billing provides denial management, corrected claim review and billing workflow support. Contact us at info@neximedbilling.com or +1-406-2251570.

Related reading: Transitional Care Management Billing: CPT 99495 and 99496 · Remote Patient Monitoring Billing: CPT 99453, 99454, and 99457 · Claim Denial Codes: Complete Guide